Primary finding
Probable cause
the failure of the operator's mechanics to install the turboshaft engine's forward curvic seal during a gas generator turbine (GGT) replacement. Contributing factors to the incident were the failure of the manufacturer to provide a forward curvic seal with the replacement GGT, and the lack of a curvic seal installation verification inspection in the maintenance manuals following the GGT installation.
Investigator assessment
Analysis narrative
The twin-engine helicopter's number 2 engine experienced an uncontained engine failure and liberated debris punctured the helicopter's firewall while in cruise flight. The pilot made an uneventful landing at a nearby airport. Examination of the engine revealed segments of the stage 2 aft cooling plate (S2ACP) exited the power turbine case. Further investigation determined that the gas generator rotor's forward curvic seal was not installed during the operator's replacement of the gas generator turbine (GGT) module 92 hours prior to the event. Manufacturer's analysis of the missing curvic seal revealed it would have caused the reversal of the secondary airflow in the B-sump, which eventually led to auto ignition of the B-sump oil and exposure of the B-sump hardware to elevated temperatures. The elevated temperatures resulted in the separation of several B-sump components, including the separation of the compressor shaft. The compressor shaft separation resulted in the GGT rotor to rub into the stator and extensive secondary damage, including the separation of the S2ACP. The GGT module was replaced 209 hours prior to the event. According to the manufacturer, the forward curvic seal is part of the engine assembly rather than part of either the GGT rotor assembly or the high pressure compressor rotor assembly. According to General Electric (GE), if the curvic seal was removed from the engine during removal of the previous GGT rotor-stator assembly, and either discarded, or returned to GE's service facility with the rotor, a new seal would not have been included with the new GGT rotor-stator assembly, and the GGT could have been reinstalled without it. The manufacturer also reported that the maintenance manuals did not call for the verification of curvic seal installation during GGT replacement. This military engine was not a Federal Aviation Administration (FAA) certificated engine, but did share similar design features of other FAA certificated engines. The manufacturer reported that the civilian certificated engine maintenance manuals do call for the verification of curvic seal installation following a GGT replacement. The engine was removed from the event helicopter 92 hours prior to the event and was shipped to an engine service center for an internal leak at the number 3 labyrinth seal (located in the front frame of the engine). The service center repaired the inlet guide vanes, which, according to the manufacturer, was a typical repair when oil is observed leaking in the flow path in front of the compressor. However, their analysis of the missing curvic seal indicates that it too would have resulted in an oil leak in the front frame.
Source record
Factual narrative
HISTORY OF FLIGHT On August 30, 2004, approximately 1240 Pacific daylight time, a Sikorsky S-70A twin-engine helicopter, N160LA, experienced an uncontained number 2 engine failure upon reaching cruise flight. The helicopter landed uneventfully with minor damage at Whiteman Airport, Pacoima, California. The airline transport pilot and two paramedics were not injured. The helicopter was registered to, and operated by, the County of Los Angeles Fire Department (LACoFD) as a public-use flight under the provisions of 14 CFR Part 91. The helicopter departed an unimproved landing area approximately 5 minutes prior to the event, and was destined for Palmdale, California. Day visual meteorological conditions prevailed, and a company visual flight rules flight plan had been filed for the flight. According to the LACoFD pilot, the helicopter departed on its second flight of the day at an operating weight of 16,900 pounds. It departed the landing area, which was located on top of a mountain at the 3,700-foot level. The observed temperature was 90 degrees Fahrenheit. Upon reaching 100 knots with 80 percent torque, the pilot heard a loud bang followed by a slight yaw variation. The pilot observed that the number 2 engine parameters were indicating a power loss. The pilot performed the emergency procedures, and diverted to the Whiteman Airport where he performed a run-on landing. The helicopter's number 2 engine (serial number 763397) sustained damage from uncontained engine debris at its 8 o'clock position, and the helicopter's titanium firewall was punctured in two locations. One piece of uncontained debris punctured the firewall within 1.5 inches from a fuel line. AIRCRAFT INFORMATION Engine Information The incident helicopter was a public-use version of Sikorsky's Black Hawk helicopter. It utilized two General Electric (GE) T700-701C turboshaft engines, each rated at 1,890 shaft horsepower. The T700-701C engine is not a Federal Aviation Administration (FAA) certificated engine, but shares numerous similarities with the CT-7 turboshaft/turboprop engines, such as the ones utilized on the SAAB 340 transport category turboprop airplanes. The turboshaft engine consists of four modules; the cold section, hot section, power turbine section, and accessory section. The cold section module includes an inlet particle separator and variable inlet guide vanes (IGV) and variable stage 1 and stage 2 vanes. The cold section also includes the compressor section, which utilizes a five-stage axial low-pressure compressor (LPC) and one centrifugal stage high-pressure compressor (HPC). The hot section module consists of three subassemblies; the gas generator turbine (GGT), stage 1 nozzle assembly, and combustion liner. The GGT consists of a gas generator stator assembly and a two-stage, air-cooled turbine rotor assembly, which drives the compressor and the accessory gearbox. The nozzle assemblies direct gas flow to the gas generator turbine. The power turbine (PT) section module includes a two-stage power turbine, an exhaust frame, and the shaft and C-sump assembly. The PT rotors drive the input to the main rotor transmission. Engine History Engine serial number (SN) 763397 was shipped from GE's manufacturing facility located in Lynn, Massachusetts, in July 1998, and entered operation with the LACoFD in 2000, when it was installed in the number 2 engine position of a sister ship with zero hours since new. On July 20, 2003, at an engine total time of 1,077 hours, LACoFD maintenance personnel removed and replaced the GGT after a temperature exceedance during an overspeed check. The replacement GGT was new. An endorsement in the engine maintenance logbook dated March 1, 2004, (engine total time of 1,284 hours) indicated that the GGT was removed from SN 763397 after 207 hours of operation due to low performance and returned to GE's engine service center. On March 19, 2004, (at an engine total time of 1,284 hours) LACoFD personnel installed another GGT, which had been received from GE in November 2003. This rotor had 850 hours on the GGT disks and stator assemblies, 1,077 hours on the stage 1 aft cooling plate (S1ACP) and stage 2 forward cooling plate (S2FCP), and a new stage 1 forward cooling plate (S1FCP) and stage 2 aft cooling plate (S2ACP). On June 8, 2004, the number 2 engine was removed from the sister ship at an engine total time of 1,401 hours, and shipped to GE's engine service center due to a front frame oil leak (number 3 labyrinth seal). The service center removed the front frame and repaired the IGV, which according to GE is a typical repair when oil is observed leaking in the flow path in front of the compressor. The service center did not expose or remove any of the hot section components. The engine was returned to the LACoFD and installed in the number 2 position of N160LA (the event helicopter). Maintenance personnel conducted an engine performance calibration. The performance check showed a low, but acceptable performance margin. LACoFD personnel began keeping an oil consumption log on August 19, 2004, after noting an increase in oil consumption. The following is a listing of that oil consumption log: - 08/19/2004; Aircraft total time 1,048 hrs; 38 oz added - 08/24/2004; Aircraft total time 1,062 hrs; 22 oz added; (estimated oil consumption per engine hour 36 cubic centimeters - cc) - 08/28/2004; Aircraft total time 1,066 hrs; 22 oz added; (estimated oil consumption per engine hour 124 cc) - 08/29/2004; Aircraft total time 1,069 hrs; 24 oz added; (estimated oil consumption per engine hour 180 cc) - 08/30/2004; Event occurred at an Aircraft total time of 1,072 hrs According to GE, the maximum limit for oil consumption is 133 cc/hr. At the time of the event, the number 2 engine accumulated a total of 1,493 hours, and had not yet undergone an overhaul. WRECKAGE AND IMPACT INFORMATION Engine Examination The engine, along with the debris liberated from the engine case, was shipped to GE Transportation's Development Assembly Building 42, Lynn, Massachusetts, where it underwent a teardown examination under the supervision of FAA Engine Certification Office personnel. The following information was gleaned from the GE and FAA teardown examination reports. Damage on the engine is referenced via a clock face when viewed from the front of the engine looking aft. The PT case was punctured about the 9:00 o'clock position just forward of the T4.5 harness. About the 3:30 position, the case outside diameter was also bulged outward, but not punctured. Extensive damage was observed on all turbine blades, vanes, T4.5 probes, shrouds, honeycomb seals and seal teeth. The stage 3 disk forward face and PT shaft bolts and nuts displayed heavy rubs and wear damage. Large amounts of debris were recovered from the cavity between the GGT and PT rotors, as well as in the transition duct. The PT shaft was cut in two after it became trapped in the engine's B-sump/mid-frame area during PT module removal. The fragments that exited the engine case were similar in geometry to sections of the S2ACP (normally located in the GGT section). The S2ACP was found with a 230-degree section of the web completely separated above its rabbet. The remaining circumference of the cooling plate was separated just below the seal wire-retaining groove. Heavy rub damage was noted on the S2ACP seal teeth and aft side of the remaining web material. The tiebolts, which provide axial retention of the stage 1 and 2 assemblies, were rubbed and worn. The S2FCP seal teeth were heavily rubbed and broken. The stage 2 turbine disk displayed significant rubs on the aft face of the bore, and deposited metal and light rubs on the aft face (adjacent to the area where the cooling plate rim was missing). The stage 2 nozzle assembly had heavy rubs on the forward face, and the heat shield was completely destroyed,