Primary finding
Probable cause
Inadequate installation of the fuel control by company maintenance personnel and a loose nut on a line. A disconnected Pc line was a factor.
NTSB investigation record
Hughes 369D· N8306F
Primary finding
Inadequate installation of the fuel control by company maintenance personnel and a loose nut on a line. A disconnected Pc line was a factor.
Continue research
Continue with the strongest shared characteristics.